ENERGY

HEPP

Aslancık
Aslancık Elektrik Üretim A.Ş.
Address
Cumhuriyet cd. Gürsel Plaza No:123 Kat:4 Beykoz/İstanbul
Tel
+90 216 680 30 30
Faks
+90 216 680 30 35

Boyabat
Boyabat Elektrik Üretim ve Ticaret A.Ş.
Address
Kavacık Cumhuriyet Cad.Gürsel Plaza No:123 Kat:4 Beykoz/İstanbul
Tel
+90 216 537 81 41
Faks
+90 216 537 81 46

Aslancık Dam and HEPP

Aslancık Dam and Hydroelectric Power Plant is situated on Harşit Brook within the town limits of Doğankent and Tirebolu in Giresun province. The project’s construction began in the fourth quarter of 2010 and the first 60 MW unit was commissioned in March 2014. With the commissioning of the second 60 MW unit in September 2014, the power plant started full capacity generation.

Doğan Holding has a 25% share in the project while Doğan Enerji holds an 8.33% share in the 120 MW Aslancık Dam and HEPP Project. The other partners of the project are Anadolu Group and Doğuş Enerji. The project’s electricity generation license was received from EMRA on March 20, 2008; the power plant is expected to generate 350 million kWh of energy annually. Aslancık HEPP is the second HEPP project commissioned by Doğan Enerji. The power plant has reinforced the Group’s investment vision in the enerji sector, while providing 100% domestic contribution to the national energy supply.





Boyabat Dam and HEPP

The 513 MW Boyabat Dam and HEPP is located in northern Turkey, on the Kızılırmak River. Doğan Enerji owns 33% of Boyabat Elektrik Üretim ve Ticaret A.Ş. The other partners of the project are Unit Elektrik and Doğuş Enerji. The license of the Boyabat Dam and HEPP project was obtained from the Energy Market Regulatory Authority (EMRA) on November 13, 2007. The project became fully operational in 2012. The Boyabat project is expected to generate about 1 billion kWh electricity per year.

© 2014 Doğan Şirketler Grubu Holding A.Ş.